仔细看Annex C 中的C.1 overload test,
: E4 O D9 {/ V T {C.1 Overload test
, D+ M; l/ r {( @) @5 w! @If the tests in this clause are conducted under simulated conditions on the bench, these2 e- P3 v% g; i
conditions shall include any protection device that would protect the transformer in the- \/ N3 f. e4 _' O
complete equipment.
1 A. ~' m7 C$ @7 QTransformers for switch mode power supply units are tested in the complete power supply unit$ W" E4 m( j8 w; z
or in the complete equipment. Test loads are applied to the output of the power supply unit.
; j2 I0 F7 J8 H) I9 s' u3 |A linear transformer or a ferro-resonant transformer has each secondary winding loaded in
9 m+ `+ n; k1 I0 Gturn, with any other secondaries loaded between zero and their specified maxima to result in
$ ^9 x6 E' E; x: Y2 ] cthe maximum heating effect.
, j7 c6 H- A8 P. {' hThe output of a switch mode power supply unit is loaded to result in the maximum heating
# y" T* Z' a& R9 peffect in the transformer.! ~: T4 D& W- M" u
NOTE For examples of loading to give the maximum heating effect, see Annex X./ U+ W; a8 Q2 F2 V* Q
Where an overload cannot occur or is unlikely to create a hazard, the above tests are not- b/ i; Z4 W. u7 o
made.1 r' h/ Y; W' W8 \& ~, s* P
最后这句话:Where an overload cannot occur or is unlikely to create a hazard, the above tests are not made.
G. E7 b7 K" u. V( A. c- d2 ^7 I6 x我觉得可以作为不用做过载的依据。 |
|