|
澳大利亚标准组织今天发布了AS/NZS 60335.2.9/A1:2011,其内容可以在SAI global的网站免费下载。看了一下,内容主要是修改了22.113针对多士炉的弹射装置,提出了专门要求。
7 b; r o/ i |1 J0 x6 x由于欧洲还没有发布针对IEC 60335-2-9:2008的EN版本,所以欧洲什么要求还不知道。4 A9 Z5 j3 X) `% t
: p- l! d+ {' l! w内容如下,大家可以探讨一下:
: I: |9 h, c2 x- b3 E. ^) E8 \& L! p+ A; |9 _. v: G" p* [
22.113 Replace the text by the following.) z1 @. j4 R& e0 N* |
Toasters having an ejector mechanism shall be constructed so that they switch off+ c/ h: Q4 w/ p7 L% M
automatically after the normal toasting time even if the ejector mechanism is; _' w/ B/ o* R# P
blocked by the bread.' J4 O8 U2 W! B0 N. |) d9 h
Furthermore, toasters having an ejector mechanism shall be constructed so that4 d0 p- @1 h5 b! Y& X
they switch off automatically after the normal toasting time even if the operating
; |) F; t% Q5 j* A2 ^ Y; slever is held down. This requirement is not applicable to toasters having an ejector
5 a) ] U4 [+ c+ O. ~8 Hmechanism if the operating lever is recessed so as to avoid it being inadvertently
7 S J8 x9 h/ V* Zheld down by a vertically moving roller door or the like. P6 \* O9 G2 V6 m1 Q6 \: G/ u
Compliance is checked by inspection and by the following tests for ejector& Q3 P/ B* S& a3 N7 ]6 i
mechanisms blocked by the bread and for toasters not having a recessed operating( o- q, @) I8 e# n0 V
lever.6 m$ H; F& r- z( b, B( k
The toaster is supplied at rated voltage and the ejector mechanism is prevented: b" k' i) V7 g
from releasing. On the completion of the normal toasting time, heating elements
3 |, {6 p4 Y& I! Y) M! hshall be automatically disconnected from the supply by at least an all-pole
! F. d' D+ Q. ?/ f' mdisconnection, micro-disconnection. However, a single pole, micro-disconnection* S4 p% @: z! S' r& \' m; c
is allowed, provided heating elements are not accessible to the test probe 12 of IEC
- e% x7 P$ P8 v) y61032.
: p+ y. j. R! w. g' A5 xFor toasters not having a recessed operating lever, the test is repeated, the
; t2 Q4 Q$ G5 g* ]toaster being supplied at rated voltage with the operating lever prevented from) f- Z: |4 t; b
releasing. On the completion of the normal toasting time, heating elements shall be& n7 }4 a& t9 C% c! x
automatically disconnected from the supply by at least an all-pole disconnection,
, l% Q( {, _: H( C8 m. amicro-disconnection. However, a single pole, micro-disconnection is allowed,
& e( b5 t# I% I# b* K8 l J' W, |) wprovided heating elements are not accessible to the test probe 12 of IEC 61032. |
|