|
澳大利亚标准组织今天发布了AS/NZS 60335.2.9/A1:2011,其内容可以在SAI global的网站免费下载。看了一下,内容主要是修改了22.113针对多士炉的弹射装置,提出了专门要求。; I) Z3 _1 j( c
由于欧洲还没有发布针对IEC 60335-2-9:2008的EN版本,所以欧洲什么要求还不知道。. \- i: X1 Q3 g0 o r
! O( B( i& u# _1 S
内容如下,大家可以探讨一下:1 j2 y/ T( z+ h( \+ A; h* C
: E* \! B" I, U; f
22.113 Replace the text by the following.
, H2 }, N4 m2 U$ CToasters having an ejector mechanism shall be constructed so that they switch off
+ ^" |+ p* J9 f- gautomatically after the normal toasting time even if the ejector mechanism is; |' a% L' F$ i: M% y/ G- x4 j
blocked by the bread.
! p @& [( Q% d9 |) BFurthermore, toasters having an ejector mechanism shall be constructed so that) C# w) U3 u" C4 w6 p8 q4 o1 ?
they switch off automatically after the normal toasting time even if the operating
3 V9 Q! m, M6 v: Qlever is held down. This requirement is not applicable to toasters having an ejector1 L9 ^- v' ^% I2 ]8 ?, ^% H
mechanism if the operating lever is recessed so as to avoid it being inadvertently
. w x: Z' @) _held down by a vertically moving roller door or the like.+ W7 t8 l; M$ |: p6 t& }$ \* C" P: z
Compliance is checked by inspection and by the following tests for ejector
3 d% A7 a7 i S5 Y7 ~# W8 qmechanisms blocked by the bread and for toasters not having a recessed operating. P% |6 B" p5 m ~
lever.$ _+ L& g# B. u; X) r# R* f9 z
The toaster is supplied at rated voltage and the ejector mechanism is prevented
* |# r4 [8 g9 w! [( [. T8 vfrom releasing. On the completion of the normal toasting time, heating elements
, y- \6 C7 [: `& d) F# eshall be automatically disconnected from the supply by at least an all-pole# P9 T, V- F+ t6 m
disconnection, micro-disconnection. However, a single pole, micro-disconnection W6 T4 ]/ G* y' o# p
is allowed, provided heating elements are not accessible to the test probe 12 of IEC
5 J% Y0 Q' w2 y- Q, r. |61032.2 f' v5 {1 |% K" m
For toasters not having a recessed operating lever, the test is repeated, the) e! q3 s2 l5 t4 T. o) H# b
toaster being supplied at rated voltage with the operating lever prevented from/ [% F: _; Y/ |7 s
releasing. On the completion of the normal toasting time, heating elements shall be0 p3 v# a3 @5 o1 ~# V
automatically disconnected from the supply by at least an all-pole disconnection,
$ _) l7 P; k4 R1 P4 k7 @! |micro-disconnection. However, a single pole, micro-disconnection is allowed,; C5 J$ E5 B/ Z: g# D- r
provided heating elements are not accessible to the test probe 12 of IEC 61032. |
|