|
Clause 5.4.9 和 950 5.2 差异性。
5 \) A' M2 ]" d: P% J C% X- y& a(1) Request based on transient voltage from main power supply or external circuit0 _% f' C5 X5 w0 p- V& \& w; z
Withstand voltage( I9 I7 i0 c3 D. e
② Peak operating voltage
# K" c: Z7 k3 k ^③ Temporary overvoltage6 ?* o4 V: p4 l( M& b; u1 n+ ]
The withstand voltage value will be determined in consideration of (1), (2) and (3) above.
/ v3 \& @, C. A8 }* r, h2 Ling. IEC62368-1 has methods 1 to 3, and you can choose from them.
4 c' o. _; L/ i3 _% PSelect to determine the test voltage. Not in IEC60950-1" E% ]( ?# V" A
Dielectric strength test jig for sheet-shaped insulators has been added
' k8 h, C5 h7 ~rice field. (Dielectric strength test jig according to IEC60065)! M- J/ H6 K2 o6 {9 ^6 ]
|
|