By the way, not only focus on the detailed desciption, but also the section general, and try to find out the description related with the transformer.
& M4 s' J) G3 d2 [' h1 v3 v5 {( `0 K3 o, p U+ Y) n
And by the way, for the critical components description, you may not find out the description directly named with "transformer", but you possibly may find the description related with the subassembly of the transformer, such as the insuted tapes, bobbin, and etc, those may be indicated as the requirements of the transformer, and could be required to be UL R/C...
- _% Z$ E0 p$ d+ s' {& V; Q) p. H. d, r. Q l0 Y
And if all above you checked can comply with the FUS procedure's description, then rest assured, and no need to be anxious, and what you should do is to prepare the documents as many as you can, in order to be checked by the UL field representative during the IPI.
3 m$ W( S& K$ U ?0 N ]: ~8 \! A$ T5 I9 J$ T, B# G; I+ r
And finally, make good communication with the UL factory auditor during the factory audit, it's more important than everything... |
|