$ X, Z( u& h6 m' ~ | Endurance test for built-in ignitors in the rectifying test circuit
% y4 [9 Q, A0 U9 c" O. S | 12.1 – 12.2# D2 s) X- u* C. |) i+ b8 x
| 60927(ed.3)# `6 O$ ~% V/ ]5 x5 `' v3 R7 n
| # q( }( N9 }6 o. a" m
Standard(s):& q. g9 [) z+ _7 B' w' @; u
IEC 60927/2007! V9 p& L" l/ g
Subclause(s):; f, z( W' L- P" A# z1 K
12.1 – 12.2
" k; ~9 L6 w8 _5 ?! @ J; bNo. Year PDSH 0994 2010
# j6 `& ?& ]& j- V# w! S: BCategory: LITE Developed by: ETF5 OSM/LUM7 Q8 ~5 A$ D& q7 Q" ]
Subject:
3 l4 S2 b6 T) @6 F, rEndurance test for built-in ignitors in the rectifying test circuit
0 G8 }3 p7 q( ZKey words:
8 J; |( k! ]* `. E/ H8 M1 |- Test quantity7 D3 C- B C- r4 r6 x- G5 y$ K
- Additional ignitors
; m7 |' N# |) m6 g) o& K- 30 days" N) w# l o b9 S( S9 v
To be approved at the 49th CTL Plenary Meeting, in 2012
) v& ?2 R' X4 aQuestion:
# L* ?, |! B9 Z- Y# i: S; A' Z1) According to the § 12.1 of IEC 60927/A1 the test quantity shall consist of two additional ignitors for
+ z- i$ P3 x3 Zthe test as specified in the third paragraph of 12.2:
* d* s, w, z) Z8 {' K“Ignitors intended to be connected in series with discharge lamps which could, according to the. [# r g0 w+ r2 M$ N' A
specification lead to ballast / ignitor overheating, are tested additionally under conditions with maximum1 f; D. L+ [, ^) I
case temperature brought to (tc + X)°C and with rectifying test circuit in accordance with IEC 60598-1 V
1 C" O) o G, ]' cEdition, § 12.5 and Annex C”." o8 M5 [6 c( y! E, B9 A
In doing so, if we test ignitors intended to be built-in, without replaceable switching elements, the ignitors4 h& c D6 ^ I1 D
shall be subjected to 30 days continuous operations so that the lamp current is adjusted to maximum (by
) b. o/ d% M, R- Yvarying the resistor R2), but in any case not higher than three times the normal lamp current. The test
8 ^# d" W: a2 r# I/ W6 g2 r2 jvoltage is 1,06 times the rated supply voltage of the ballast. Our experience shows that some ignitors) N2 o! D, O$ L. ^
reach the maximum case temperature at room temperature in this circuit, when they are placed on a! ~' ^/ ]: f9 _( r
wood board. Can the test be performed in this arrangement and the type accepted if after the test both
Q5 }$ i. _0 @( P7 V0 mignitors comply with the relevant requirements? If the answer is no, how shall the test be performed?
. b8 }9 Q4 }1 {; R2) Is it acceptable that the marking point for tc and (tc + X) would be at different places on the ignitor?( {8 f) K* c5 x8 q3 b; x6 u
Decision:$ V( U5 |( o1 c6 J: x- F& e4 Y
1) Yes.
: C& b% N9 G/ D) s P0 b2) No. X% E" y3 Q6 }$ f$ M% a! O; h
- L9 X3 ~- i$ u8 r+ B6 v3 Z
6 o' [+ C& n9 f3 ]# r# E
0 Q0 C/ T8 R* F- w
& p/ L# F6 j6 e/ l |