直流侧可有可无,通过short test评估就OK;
9 I$ U: A# Q, B# L! R交流侧就看你设计了,要样机里没有,需在说明书中说明装机时交流侧用的外置Fuse的Rating,相关要求如下(IEC 62109-1):
x( Y5 k: D2 g+ N
0 u, w8 H" Z$ [- B. J4.4.4.5 Output short circuit
" b7 j' h+ l G# ]% B) b, ?Each power output port of the PCE, and each section of a tapped output, shall be tested one
$ A. `' Q+ }: U9 Sat a time, to simulate short circuits in the load or wiring. Overcurrent protection devices as$ t& O) D- ~8 @# O8 ]
provided in the PCE or as specified in the installation instructions, shall be fitted during the
9 {5 X% {# N, Q. e- Ltest. All other outputs are loaded or not loaded, whichever load condition of normal use is less
. I3 \$ z$ Y$ W. H @6 Pfavorable.
1 ~5 B; l: [3 P# m: x q8 ITesting is required to be performed on all combinations of terminals for the port under' ~. O5 u4 f' M
consideration, two at a time, including neutral and earth terminals, and one test with all
% f5 u' P4 o8 b, i0 `current-carrying terminals of the port shorted together at once. Where analysis shows that the
8 T* ? @6 z! _- w0 u) xtest for one combination is representative of other combinations, tests may be omitted.. ]0 J& s) a8 D7 z1 A
In addition to the requirements of 4.4.3, the short-circuit currents are to be recorded and if; D% h2 C% R' d# r8 q& E( Z7 p$ _
they exceed the maximum rated current of the circuit, the maximum measured current shall be, F7 v8 {. r! ?, L4 ?( [7 c! E
provided in the installation manual for the purpose of coordination of overcurrent protection of
% S. Y! {' z" mthe external circuit conductors (see 5.3.2).
/ _ c, Y$ N( iThe value(s) to be recorded and to be provided with the PCE instructions are the peak
3 ?- q, y: G2 y- Z( Y- E4 ~( v E! Qcurrent, and the highest of the RMS current values measured or calculated over a time period0 v' b# q% \; L' J* N
as follows:: Q; ^" @% u8 r/ z0 |0 ^
a) for AC signals, 3 cycles of the nominal AC frequency for the port under consideration, in( L9 p: _4 c. H1 Q- h
which case the value is to be stated as the 3-cycle RMS value;
' Q$ G& u& H3 E2 Ab) for all signals, the duration of the short circuit from the time the short circuit is applied, until9 [" L: s% k" j: M
the time the short circuit current is interrupted by a protective device or other mechanism, in$ \& D/ q/ W2 J- ]+ @& l& p
which case the value stated is to include the RMS value and the time period in seconds;
u0 D+ x$ F, j3 [! M' cc) for short circuit tests that result in a continuous non-zero value, the steady-state RMS
8 T$ D6 n; X: V; w y( gvalue, in which case the value is to be stated as a continuous RMS value.0 U, b% d$ g# z; k, M% g. Z
NOTE Where the intended use of the short-circuit current information requires a different type of measurement,& ~; P6 `' N: Y4 `2 d, q, e* `0 U3 O& ]
additional data may be provided. For example, for AC mains fault current contribution some utilities may prefer a8 u0 I' L4 h* z# i$ P, b
¼-cycle RMS or other RMS calculation to the 3-cycle RMS above. |
|