IEC60065:2001+A1:2005《音频、视频及类似电子设备安全要求》中新增了8.22条对不可分离薄层材料的测试规定6 f: H- u X, V
8.22 Test specifications of non-separable thin sheet material
/ I& g5 G, o. o- }& ]" L# xCompliance is checked by subclause 26.3 in IEC 61558-1or by the following:% D, O. g4 j0 z0 ~2 N/ T& U" _
Three test samples, each individual sample consisting of three or more layers of non-separable4 X" v3 t& T6 t, M% p
thin sheet material forming REINFORCED INSULATION, are used. One sample at a time is fixed to5 W0 l Z) U8 Q1 D2 K/ [+ s0 [* k
the mandrel of the test fixture (Figure 14) as shown in Figure 15.
: h4 b7 o# \: ACopyright InternationalA downward force of 150 N ± 10 N is applied to the free end of the sample (see Figure 16),
: [8 s% y, h4 Y0 E! o! yusing an appropriate clamping device. The mandrel is rotated by hand without jerks
, T6 p3 c6 w8 A– from the initial position (Figure 15) to the final position (Figure 16) and back;
9 v: e" ^2 @- I ^( I: x8 ?– as above for the second time;) A; e0 c$ t7 V4 B4 l0 D
– from the initial position to the final position./ f) G0 K( X) P% ^! ^3 t7 E
If a sample breaks during rotation where it is fixed to the mandrel or the clamping device, this; M4 c t r1 e# Q
does not constitute a failure and the test is repeated on a fresh sample. If a sample breaks at, `4 j$ O t. V# O6 p
any other place, the test has failed.
0 h- R; B9 C l8 N! YAfter this preconditioning, a sheet of metal foil, 0,035 mm ± 0,005 mm thick, at least 200 mm) D+ G( {! \! m2 u
long, is placed along the surface of the sample, hanging down on each side of the mandrel
! |6 n* i6 }5 y" n* T, A# O+ `(see Figure 16). The surface of the foil in contact with the sample shall be conductive, not
2 y' f7 t4 Z# c; |oxidised or otherwise insulated. The foil is positioned so that its edges are not less than 18 mm9 [( N+ U( V' z! v+ O
from the edges of the sample (see Figure 17). The foil is then tightened by two equal weights,& J3 k6 I' d: }& _* Q
one at each end, using appropriate clamping devices.
+ ?/ \ l0 }$ D2 A2 jWhile the mandrel is in its final position, and within the 60 s following the final positioning, a0 [8 L: c3 b6 }* R) [& e3 u
dielectric strength test is applied between the mandrel and the metal foil in accordance with. U2 e: k4 U& y o/ w( F9 s A
10.3.2, using a test voltage of 1,5 times the value specified in Table 5 for REINFORCED
* s l* N( e! i. V' ~( |! G3 zINSULATION, but not less than 5 kV.0 L9 y8 H6 M/ B3 c' ?7 E
The entire test procedure is repeated on the other two samples.
/ m- @5 i6 G- z* {" g$ t- V$ R2 YNo flashover or breakdown shall occur during the test; corona effects and similar phenomena being disregarded.1 z- S1 I5 R3 r+ ^8 Z, r8 B- n
( \% P9 o) y% `, L! C( d
有没有哪位筒子熟悉这个新设备的,或者有相关图片介绍下,谢谢 |
|