|
澳大利亚标准组织今天发布了AS/NZS 60335.2.9/A1:2011,其内容可以在SAI global的网站免费下载。看了一下,内容主要是修改了22.113针对多士炉的弹射装置,提出了专门要求。
% b C0 }' ]( E+ Y, i由于欧洲还没有发布针对IEC 60335-2-9:2008的EN版本,所以欧洲什么要求还不知道。& S1 A! d: O! n* \/ M
+ `7 V2 Y! R! w6 w' t; }内容如下,大家可以探讨一下:7 y* K4 _, x+ A( l/ B1 ?
8 L) [. h0 Q2 `$ l* W) }
22.113 Replace the text by the following.
. c: T, `" m+ S' bToasters having an ejector mechanism shall be constructed so that they switch off9 W' r4 N, ^, u5 ]' r" V
automatically after the normal toasting time even if the ejector mechanism is
" D& o8 z5 n+ N% o5 H% g! Mblocked by the bread.
" J1 X7 ]8 J9 S6 N$ @8 l- dFurthermore, toasters having an ejector mechanism shall be constructed so that D; ]' n* Z( ^2 i; k: J; g
they switch off automatically after the normal toasting time even if the operating" y: I. [+ A! S
lever is held down. This requirement is not applicable to toasters having an ejector9 G9 E4 L3 Z6 \4 e5 \, B
mechanism if the operating lever is recessed so as to avoid it being inadvertently6 n6 Z1 I4 i* j. t; O! t( {" y
held down by a vertically moving roller door or the like.& R* H- A! a* m
Compliance is checked by inspection and by the following tests for ejector+ i w" F) ~% e$ y
mechanisms blocked by the bread and for toasters not having a recessed operating
; |- F Q# T* h9 y2 _9 Ilever.# h( X* x9 F% a4 C
The toaster is supplied at rated voltage and the ejector mechanism is prevented9 w1 X( y$ d" g7 f4 w
from releasing. On the completion of the normal toasting time, heating elements
( L* P4 F, A( Ishall be automatically disconnected from the supply by at least an all-pole
' H* N3 m2 N: Y* @7 H! r- ddisconnection, micro-disconnection. However, a single pole, micro-disconnection1 |* p: i8 `& x4 D6 z( |6 D
is allowed, provided heating elements are not accessible to the test probe 12 of IEC8 a# D5 W) Y7 D8 w; z+ ~. z0 ~* Q
61032.+ `& O7 J$ [# H
For toasters not having a recessed operating lever, the test is repeated, the9 X; V+ x+ ? {& U1 S. m) {
toaster being supplied at rated voltage with the operating lever prevented from/ ~; [' e7 Q; c1 ] Y# k _, A# l P
releasing. On the completion of the normal toasting time, heating elements shall be; g' k5 O- l1 O" L0 n
automatically disconnected from the supply by at least an all-pole disconnection,1 {* P# { r2 M. N3 j& k& [, s
micro-disconnection. However, a single pole, micro-disconnection is allowed, z* A( T0 c, |+ G" d& D1 k
provided heating elements are not accessible to the test probe 12 of IEC 61032. |
|