澳大利亚标准组织今天发布了AS/NZS 60335.2.9/A1:2011,其内容可以在SAI global的网站免费下载。看了一下,内容主要是修改了22.113针对多士炉的弹射装置,提出了专门要求。4 }! N u4 ^' N2 G0 E
由于欧洲还没有发布针对IEC 60335-2-9:2008的EN版本,所以欧洲什么要求还不知道。
7 d2 B) M2 z) U3 y; _4 a8 m" P. d! D: N
内容如下,大家可以探讨一下:
+ M) Q* T; a U. Y
! b" [6 y% x; V7 A/ X9 Y$ v( Y22.113 Replace the text by the following.) o2 ]/ J! O( ^
Toasters having an ejector mechanism shall be constructed so that they switch off
1 f0 K3 T0 S- H7 E. x- ~automatically after the normal toasting time even if the ejector mechanism is
" M1 t* V$ o$ } v% b9 c! |blocked by the bread.
5 x- C8 E1 [ B, B# F: f( o. jFurthermore, toasters having an ejector mechanism shall be constructed so that
- F$ ]6 a; l! i1 F) g0 ethey switch off automatically after the normal toasting time even if the operating
% I( d5 c0 @6 O% t' nlever is held down. This requirement is not applicable to toasters having an ejector
" P$ a- \; T2 a) @* F4 dmechanism if the operating lever is recessed so as to avoid it being inadvertently
+ z# T* f+ ?: o; Q. Q. L0 i6 Y. iheld down by a vertically moving roller door or the like.! |1 K) r* J Y" D9 g* ~
Compliance is checked by inspection and by the following tests for ejector: q/ m+ F- w9 P; g
mechanisms blocked by the bread and for toasters not having a recessed operating3 V/ j0 y m% J
lever.6 W# B) A" S6 o4 Q4 g, ]) s
The toaster is supplied at rated voltage and the ejector mechanism is prevented
1 p% P: l3 H% Z5 G3 t4 X2 ofrom releasing. On the completion of the normal toasting time, heating elements M6 x& G2 M7 {& R+ C5 }& M% t3 o( e
shall be automatically disconnected from the supply by at least an all-pole) L- j" q4 w a" A9 b c
disconnection, micro-disconnection. However, a single pole, micro-disconnection
$ o! A7 {" B$ A* y z" Y) ois allowed, provided heating elements are not accessible to the test probe 12 of IEC
; }; p$ c. N; M+ }61032. w2 Y0 |" ~; I( @" t
For toasters not having a recessed operating lever, the test is repeated, the
$ ~9 ~8 Z0 X3 \toaster being supplied at rated voltage with the operating lever prevented from' a5 ^3 T" R, v" ~+ c Y
releasing. On the completion of the normal toasting time, heating elements shall be+ M0 t# `4 D: `- w
automatically disconnected from the supply by at least an all-pole disconnection,3 R3 e }4 l3 K( D3 j! ~' x
micro-disconnection. However, a single pole, micro-disconnection is allowed,
5 L" Z6 `/ v/ h$ E* T i$ jprovided heating elements are not accessible to the test probe 12 of IEC 61032. |
|