|
澳大利亚标准组织今天发布了AS/NZS 60335.2.9/A1:2011,其内容可以在SAI global的网站免费下载。看了一下,内容主要是修改了22.113针对多士炉的弹射装置,提出了专门要求。1 E# d2 m) }. x: X2 K2 N( I; G
由于欧洲还没有发布针对IEC 60335-2-9:2008的EN版本,所以欧洲什么要求还不知道。
N& T) B5 T7 z( W' h: V! I, `5 r/ M7 x- K B
内容如下,大家可以探讨一下:
, a- `; v T$ u& I( e; r7 o
# F+ U/ I# [# i% f22.113 Replace the text by the following.
$ A8 |3 \8 o& N' R( IToasters having an ejector mechanism shall be constructed so that they switch off/ w Y5 ]( P& r0 z
automatically after the normal toasting time even if the ejector mechanism is" J1 d" q" ]3 r+ j
blocked by the bread.
/ u y- }; {* k1 K) O% w/ JFurthermore, toasters having an ejector mechanism shall be constructed so that
3 I4 s2 E' e" y1 ythey switch off automatically after the normal toasting time even if the operating
) v& P( W. Z8 g8 v! ilever is held down. This requirement is not applicable to toasters having an ejector
8 u% {: e9 l* p) amechanism if the operating lever is recessed so as to avoid it being inadvertently
b" O4 C3 e- o; i3 \$ d R6 K* xheld down by a vertically moving roller door or the like.5 A# h" x) G7 a8 a* i
Compliance is checked by inspection and by the following tests for ejector
, c U9 q9 Z" ~* l. e3 emechanisms blocked by the bread and for toasters not having a recessed operating. W8 a: i: s! J5 U
lever.
! g$ x+ r( n6 r. C" s. V% aThe toaster is supplied at rated voltage and the ejector mechanism is prevented
f, B, ~. o+ Z& ]2 zfrom releasing. On the completion of the normal toasting time, heating elements% I' w$ {; v }- x. H
shall be automatically disconnected from the supply by at least an all-pole
. U6 A6 {" L2 qdisconnection, micro-disconnection. However, a single pole, micro-disconnection
( c0 {; `7 I T) t/ C* {8 Jis allowed, provided heating elements are not accessible to the test probe 12 of IEC8 F5 o+ P) Y( r+ H/ @; c6 _$ l( Z) K
61032.4 Y3 o& @, m& C, q1 C$ s
For toasters not having a recessed operating lever, the test is repeated, the) {0 v- k& c4 {" b- G z+ T' q
toaster being supplied at rated voltage with the operating lever prevented from" m1 L. w3 v* x) P; n, c
releasing. On the completion of the normal toasting time, heating elements shall be- U0 M# @9 U$ X- a8 K3 L
automatically disconnected from the supply by at least an all-pole disconnection,9 d7 B& j7 x% [; s0 ~
micro-disconnection. However, a single pole, micro-disconnection is allowed,3 d) d7 f/ n% S: P3 p' x7 v8 P
provided heating elements are not accessible to the test probe 12 of IEC 61032. |
|