注册安规 登录
安规网 返回首页

448080300的个人空间 http://bbs.angui.org/?147775 [收藏] [复制] [分享] [RSS]

日志

CCIC的那点事

热度 17已有 555 次阅读2014-6-10 17:21 |系统分类:工作

不知各位朋友有没有遇到这种情况:
我司申请UL认证需进行IPI首次工厂检查:
之前有跟审核主管联络过,说公司一些文件、设备没准备好,待可以安排审厂了再电话沟通。
今天CCIC审核员突然到公司,说发邮件了确定今天审厂,实际公司邮箱没有收到任何关于确定何时审厂的邮件。
审核员要开不符合项,塞了个大红包,还不知道OK不OK。我想知道这种情况是不是审核员故意搞的,想捞钱?

路过

鸡蛋

点赞

握手

雷人

全部作者的其他最新日志

发表评论 评论 (47 个评论)

回复 火水晶 2014-6-11 09:02
他来首检,你可以说没生产啊,委婉拒绝接待啊
回复 Andy.Yang 2014-6-11 09:02
jsspace: 我们公司一律不给!爱咋地咋地
Really?

If I were the auditor, I will let you know giving cash is necessary, and you would like to say thanks to me
回复 火水晶 2014-6-11 09:04
而且红B还给3X,你们不会一个不符合项就给X,3个就3X吧
你们把物价抬这么高,我们怎么办啊
回复 jsspace 2014-6-11 09:04
Andy.Yang: Really?

If I were the auditor, I will let you know giving cash is necessary, and you would like to say thanks to me
真的,我们公司不给!不惯他们!
回复 Andy.Yang 2014-6-11 09:04
jsspace: 我们公司一律不给!爱咋地咋地
Especially for the lamps UL1598&153 covered, it's very very easy to issue the VN during the factory auditor, you know it...

Also the labels could be another focus during the factory audit, so letting your factory shutting down is so easy, understand?

In this case, even you don't want to give the cash, your boss would like to do it, right?
回复 yangcanluck 2014-6-11 09:07
哥们英语怎么不错
回复 Andy.Yang 2014-6-11 09:10
jsspace: 真的,我们公司不给!不惯他们!
that's not the reason, and a "professional" auditor will let you and your factory, your boss know, that's not the "LET IT BE"....

Finally, I still wanna say "giving cash" is not the good option, the good relationship and communication is the most important...
回复 jsspace 2014-6-11 09:11
Andy.Yang: that's not the reason, and a "professional" auditor will let you and your factory, your boss know, that's not the "LET IT BE&qu ...
感谢你的提点
回复 Andy.Yang 2014-6-11 09:21
jsspace: 感谢你的提点
I only say the reality here, sometimes, I also hate the UL factory auditor from CCIC, and as I know, the guys from shenzhen and zhejiang CCIC are more worse than anywhere else.

I hate to give cash, I still want to say  building good relationship witht the auditors is the No.1 option, but that does not mean, no cash is needed, and sometimes, giving some presents and suitable cash is the effective way to build good relationship, but that's not for closing the VN...
回复 themaster 2014-6-11 09:34
jsspace: 我们公司一律不给!爱咋地咋地
呵呵,我们也是。给钱搞定感觉没技术含量。
回复 fasten 2014-6-11 10:46
工厂不同意IPI,说CCIC确定发邮件来IPI那是扯淡,IPI由工厂预约,双方协定才算数。其实这种事情一般都是工厂惯坏的,拿出我的脾气来,痛骂CCIC的马上开VN试试看。
回复 448080300 2014-6-11 12:20
fasten: 工厂不同意IPI,说CCIC确定发邮件来IPI那是扯淡,IPI由工厂预约,双方协定才算数。其实这种事情一般都是工厂惯坏的,拿出我的脾气来,痛骂CCIC的马上开VN试试看。 ...
因为从测试完到IPI才半个月时间,而且要在产品上印刷到UL档案号,肯定没法那么快完成,不知是不是CCIC的人抓住这点故意这样搞的,现在真是拿它没办法,本来工厂就存在问题。
回复 dengwx 2014-6-11 12:27
jsspace: 我们公司一律不给!爱咋地咋地
贵司是什么公司呀?
回复 jsspace 2014-6-11 12:30
dengwx: 贵司是什么公司呀?
做灯具的
回复 jsspace 2014-6-11 12:30
dengwx: 贵司是什么公司呀?
你不会要过来查水表吧?
回复 fasten 2014-6-11 17:21
448080300: 因为从测试完到IPI才半个月时间,而且要在产品上印刷到UL档案号,肯定没法那么快完成,不知是不是CCIC的人抓住这点故意这样搞的,现在真是拿它没办法,本来工厂就 ...
请注意一点,IPI必须是工厂同意才能去的,否则可以投诉到美国去。
回复 Andy.Yang 2014-6-12 08:55
fasten: 请注意一点,IPI必须是工厂同意才能去的,否则可以投诉到美国去。
No, if there is no production at the end of the quarter when the UL FUS procedure was released, then an regular inspection will be initiated, and the report will be indicated as no UL marked products are in production...

Anyway, the IPI must be done before the first shipment, and need to be fixed based on the alignment between the factory and the field representative.
回复 Andy.Yang 2014-6-12 09:00
448080300: 因为从测试完到IPI才半个月时间,而且要在产品上印刷到UL档案号,肯定没法那么快完成,不知是不是CCIC的人抓住这点故意这样搞的,现在真是拿它没办法,本来工厂就 ...
Just for reminding, if your products which covered by your UL file is using the UL listing mark, so pls check the Listing mark data page of your UL FUS procedure, and know the UL mark requirements clearly, and if label was used(not the laser mark), then check the detailed marking requirements, normally, UL PGDQ2/PGJI2, plus the PGAA is the requirements to your label vendor, and this is one focus for a new UL approved factory....

Anyway, if the mark you used is the UL recoganized marking, then something could be ignored, at least the PGAA requirement for your label supplier could be ignored...
回复 fasten 2014-6-12 09:04
Andy.Yang: No, if there is no production at the end of the quarter when the UL FUS procedure was released, then an regular inspection will be initiated, and the  ...
Please note to what the guy said. This inspection is based on the email informed instead of the quarter requirement.
回复 Andy.Yang 2014-6-12 09:13
fasten: Please note to what the guy said. This inspection is based on the email informed instead of the quarter requirement.
Yes, I said it, the IPI is based on the alignment&e-mail between the factory and UL, and this will be indicated as the IPI notice from UL through e-mail, or something like this..

But if there is no production for a long time after the UL FUS procedure and the IPI notice was released, then an regular inspection(not the IPI) will be initiated, that's for sure there is no shipment before the IPI from UL side....

Let me explain in an easy way, if there is production actually but the factory always told UL that there is no, then in this case, how to control this factory from UL side? couldbe, you could say this is a serious non-conformance, and will be punished by UL after it pops, but the effective way is to have an regulare inspection before the IPI if there is no production for a long time after the FUS procedure was released, and this is also required by UL.

facelist doodle 涂鸦板

您需要登录后才可以评论 登录 | 注册安规

关闭

安规网为您推荐上一条 /1 下一条

QQ|关于安规|小黑屋|安规QQ群|Archiver|手机版|安规网 ( 粤ICP13023453-10 )

GMT+8, 2024-5-8 03:49 , Processed in 0.095580 second(s), 22 queries .

Powered by Discuz! X3.2

© 2001-2013 Comsenz Inc.|广东安规赞助

返回顶部