安规网

 找回密码
 注册安规
安规论坛 | 仪器设备 | 求职招聘 | 国家标准 公告 | 教程 | 家电 | 灯具 | 环保 | ITAV 签到 充值 在线 打卡 设备 好友| 帖子| 空间| 日志| 相册
IP淋雨机 | 证书查询 | 规范下载 | 资质查询 招聘 | 考试 | 线缆 | 玩具 | 标准 | 综 合 红包 邮箱 打卡 工资 禁言 分享| 记录| 道具| 勋章| 任务
水平垂直燃烧机 | 针焰 | 灼热丝 | 漏电起痕
IP防水防尘设备|拉力机|恒温恒湿|标准试验指
灯头量规|插头量规|静风烤箱|电池设备|球压
万年历 | 距元旦节还有
自2007年5月10日,安规网已运行
IP淋雨设备| 恒温恒湿箱| 拉力机| 医疗检测设备沙特Saber 埃及COI 中东GCC|CoC直接发证机构水平垂直燃烧机|灼热丝|针焰试验机|漏电起痕试验机
灯头量规|试验指|插头插座量规|灯具检测设备耐划痕试验机|可程式恒温恒湿试验箱 | 耦合器设备广东安规-原厂生产-满足标准-审核无忧
查看: 1305|回复: 1

[标准学习] UL 758 电子线芯线绞距如何规定

[复制链接]
发表于 2009-11-30 19:02 | 显示全部楼层 |阅读模式
广东安规检测
有限公司提供:
各位高手:
" B  V$ m9 Z" z6 g
* r) I" E# r1 |: O% A0 ?6 n2 M2 s   请问UL758电子线对芯线的绞距是怎么规定的,标准值是多少?
2 }. v$ t6 c+ M( Z# x# ?4 _* |谢谢!
发表于 2009-12-1 08:18 | 显示全部楼层
在UL 758表12.1有规定.
4 Z1 A$ O' X# ^# V- eTable 12.1
+ G9 Y4 ?5 c, h8 mLength of lay of insulated conductors and precabled groups for cables rated greater than 30 volts  m  M. \( J0 d& I
Number of insulated conductors in cable                    Maximum length of lay of insulated conductors and precabled groupsa
: f  u0 @( p& F4 F/ U8 f; p2                                                                                            30 times the finished insulated conductor diameterb
' h7 z" W8 S* W* V3                                                                                            35 times the finished insulated conductor diameterb
$ i$ ], Z- N6 ?4 ~4                                                                                            40 times the finished insulated conductor diameterb
& U& y/ [$ [+ e, ], A5 or more                                                                             15 times the calculated diameter of the overall assembly. In a multiple-layer cable, the length of lay of the conductors in each of the inner layers of the cable is not specified.
) T  ]7 W& G9 A4 TNOTE – Length of lay of insulated conductors in cables rated 30 volts is not specified.
( @& B" [1 [6 o0 S& M9 c3 ma The length of lay of each conductor in a group shall comply with the same values as those that are required for a cable. The
" S, T4 z) [. {3 e8 U+ Dlength of lay of each group in a cable shall comply with the same values as those that are required for a conductor.
4 s2 J; F6 |# o+ z7 Q; _b Conductor diameter is the measured diameter of the largest individual finished conductor in the cable
您需要登录后才可以回帖 登录 | 注册安规

本版积分规则

关闭

安规网为您推荐上一条 /1 下一条

QQ|关于安规|小黑屋|安规QQ群|Archiver|手机版|安规网 ( 粤ICP13023453-10 )

GMT+8, 2024-11-27 19:44 , Processed in 0.060978 second(s), 21 queries .

Powered by Discuz! X3.4

© 2001-2023 Discuz! Team.

快速回复 返回顶部 返回列表