EN60598-1:2004
" J( k: M4 j1 }4.9.2 Insulated linings, sleeves and similar parts shall have adequate mechanical, electrical
( X3 i+ a. v( M0 Z- gand thermal strength.. \! [0 B2 U, J! {! U
Compliance is checked by inspection, by manual test and by the electric strength test in
) I/ [- N8 y" h8 P0 j) t* ^7 yaccordance with section 10. The thermal properties of wire and sleeve are checked in7 q* i9 i6 g1 J& s1 y# d J5 y" _1 K
accordance with section 12. Heat resistant sleeves used as covering for wires attaining a
8 A' i& N" ]' x& l9 Vtemperature exceeding the values given in Table 12.2 of section 12 shall comply with the
$ b" b0 ~# O: Arequirements of IEC 60684, taking into account the temperature measured on the wire in# E8 H$ G3 f: D* G/ V/ d1 n
question. The sleeve shall be resistant to a temperature exceeding the temperature
$ c% c) ^$ d7 E" `2 Xmeasured on the wire by 20 °C or withstand the following test: s. R+ ]1 ?2 g2 Z# J
a) Three test specimens of the sleeve, about 15 cm in length, are subjected to the humidity
* k+ t$ ^6 q' Y5 Jtest of 9.3 and subsequently to the insulation resistance and electric strength tests
$ ]% n B S/ t5 Z$ P5 `according to section 10. A suitable uninsulated copper conductor or metal rod is passed7 j, J _% K( a2 M0 m- T, Y) n
through the specimens, and the outside is covered by a metal foil in such a way that no, N8 Y; j# Y' E I# p7 @4 Z
flashover at the ends of the samples can occur. The measurement of the insulation7 _, _1 i# D0 L; f' @! ?0 y4 m
resistance and the electric strength test is then made between the copper
7 x. j$ ]2 t" r- k* l( x2 tconductor/metal rod and the metal foil.2 b' a" D' X# G: L; d4 ^8 n
b) After the copper conductors/metal rods and metal foils have been removed, the
9 u! K& B# v! U& vspecimens are placed in a heating cabinet for 240 h at a temperature of T + 20 °C,
/ C5 {+ p9 d4 A/ S( ~$ ^; @T being the measured temperature of the wire.4 ]8 }* n$ r. s- N
c) The specimens are allowed to cool to room temperature and are then prepared as
9 n2 }6 d- K+ k" @3 [! W6 nindicated under item a) above.
9 O7 V4 ?& |/ L& a* ~2 rMeasurement of the insulation resistance and electric strength is then made between the9 Q% X" z |: b/ Y* f% d: V
copper conductor/metal rod and the metal foil.
3 [1 D0 z* Q& f. a2 N' @8 `Compliance is checked by the insulation resistance values and test voltages specified in
" a! l+ h1 a( h' [5 b: u$ ]7 BTables 10.1 and 10.2 in section 10.- n' S1 ~$ I8 Y
1 Y# ?5 z6 O" f" W1 ^4 }+ {' _+ f问:是否只要套管的耐热温度高于电线实测温度20 °C,就不需要做电气强度测试。还是任何套管都要经过相应的电气强度测试,以满足Insulated linings, sleeves and similar parts shall have adequate mechanical, electrical,and thermal strength. |
|