|
| PDSH 889/ D# g9 B {9 C( q+ f5 c# X
3 w' m8 S" [2 ^; K | Through wiring in the luminaires Z' D: {$ n/ O+ y4 Z4 J
| 5.3.1! Y; N C3 w# d5 i M u0 Z
| 60598-1(ed.3);am1 & 60598-1(ed.4);am1 & 60598-1(ed.5) & 60598-1(ed.6);am1 & 60598-1(ed.7)6 _3 W, N3 K8 h6 d8 k, r& A
| 1 Z; ^, K, M. j
Standard(s):( D* \$ D B! N* I, w) @6 }- [2 L
IEC 60598-1 All editions+ D. }' `4 m" Y* B' Q
Subclause(s): 5.3.1! _) I/ x8 H" J+ g% N
No. Year DSH 0889 20109 |0 t. }& u- r8 b+ t8 F) \1 v
Category: LITE Developed by: ETF5 OSM/LUM
9 D3 j; x& K! v- iSubject:
. F7 N$ }1 p& d& {3 mThrough wiring in the luminaires
) @6 O* a2 @8 y) d- TKey words:( a. q1 r; H- f
- Luminaire manufacturer
* o7 K) [8 p# t; @ ?- J& P7 J- Skilled persons& w7 e4 o l) T3 r6 L
- Cable/wiring; h- h, p9 P& D4 p J
Approved at the 49th CTL Plenary Meeting, in 2012! p4 a7 F. U( ?2 {/ l) q2 z
Question:- i9 o2 F3 e& N6 r6 P& \
Through wiring of luminaires doesn't need to be delivered with the luminaire, if the way of mounting is5 P0 H- m# I. G6 D
clear from the manufacturer's instructions. However, if special cables or sleeves, e.g. due to high5 C7 o. X) k8 P7 ^; W- ?
temperatures, are necessary, the through wiring shall always be factory assembled. The cables and sleeves
) L+ L& E7 a# q* t- Chave to be built-in in case of high temperatures. Is that example also applicable in case of special cables3 A6 C! y9 V/ n1 @9 D
(double insulated, normal temperature, </= 90°C) to fulfil the class II requirements?# p2 t" I" Y! f# J/ C
Decision:
6 K! D' F L: f3 x& zSuch constructions are acceptable provided that:$ a) U e# i% A6 u) P2 N# z4 v) A
- the luminaires are assembled by skilled technical persons;
' ~' I8 e% M/ N0 u8 F9 U+ r- the act of assembling is clearly described in the instructions;; \8 h- V# E7 S% V- L
- the cable/wiring is delivered by the luminaire manufacturer only.# `9 I2 Y2 h2 p8 `; F6 ^
+ I1 u& f" m- [2 \& A/ p/ A0 V) h, H7 c4 n$ N; p- H& l4 a
|
本帖子中包含更多资源
您需要 登录 才可以下载或查看,没有账号?注册安规
x
|