|
0安规金币
翻译有奖,翻译正确的奖的越多。
Clause Test Description
7.14 Marking and instructions – Marking durability test
8 Protection Against Access to Live Parts
10 Power input and current
11 Heating Test
13 Leakage current and electric strength at operating temperature
15.1 Moisture resistance – Protection degree against water test
15.2 Moisture resistance – Spillage test
15.3 Moisture resistance – Humidity test
16 Leakage current and electric strength
17 Overload protection of transformers and associated circuits
19.2 Abnormal operation – Restricted heat dissipation test (0,85 times power input)
19.3 Abnormal operation – Restricted heat dissipation test (1,24 times power input)
19.4 Abnormal operation – Temperature control short-circuited test
19.5 Abnormal operation – Test for class 0I and class I appliances with tubular sheathed or embedded heating elements
19.6 Abnormal operation – PTC heating elements over voltage test
19.7 Abnormal operation – Locking moving parts of motor test
19.8 Abnormal operation – One phase disconnection test of 3 -phase appliance
19.9 Abnormal operation – Motor overload test
19.10 Abnormal operation – Series motor overspeed test
19.11.1 & 19.11.2 Abnormal operation – Fault condition of electronic circuit test
19.11.3 Abnormal operation – Protective electronic circuit test
19.11.4 Abnormal operation – EMP test
19.12 Abnormal operation – Current fuse reliability test(refer also to clause 19.11.2,19.11.3)
19.13 Abnormal operation – Acceptance conditions after all abnormal operation tests
20.1 Stability and mechanical hazards – Stability test
20.2 Stability and mechanical hazards – Mechanical hazards test
21.1 Mechanical strength – Impact test
21.2 Mechanical strength - Solid insulation strength
22.5 Construction – Plug discharge test
22.11 Construction – Non-detachable parts push and pull test
22.12 Construction – Handles, knobs, grips and levels pull test
22.16 Construction – Cord reel abrasion test
23.3 Internal wiring – Flexing test
23.5 Internal wiring – Insulation test
24.5 Components – Motor Capacitor resonance voltage measurement
25.14 Supply connection and external flexible cords – Flexing test
25.15 Supply connection and external flexible cords –Pull and torque test
26.3 Terminals for external conductors – Torque test
27.5 Provision for earthing – Earthing continuity test
28.1 Screws and connections – Screws torque test
29 Clearances, creepages distances and solid insulation
30.1 Resistance to heat and fire – Ball pressure test
30.2 Resistance to heat and fire – Glow wire test
30.2.4 Resistance to heat and fire –Needle flame test
Annex D Thermal motor protectors
Annex H Switches |
|