|
|
如何对电吹风分离电路做39.3.3和39.3.4?UL859# u: c+ {6 q ~* A+ a6 q6 I6 s
The air inlet opening shall be gradually obstructed until the operation of all circuits is interrupted
0 {5 J8 R3 _: |. J, pby the functioning of a limit or a temperature control, or until ultimate results are otherwise obtained
5 K6 I# U( x0 r+ x4 ]- }8 c# \39.3.4.2 The air outlet is to be gradually obstructed using masking tape such that approximately 50, 75,
1 Y& b2 L G: P' S) G$ H) f90, and 100 percent of the outlet opening area is progressively blocked for 3 minutes at each of the four
4 B4 t& P, ?. k7 r. K4 G5 epositions. For each of three samples, the location at which the blocking begins (the top, a side, or bottom)
( V: b1 [/ h, X' Z @( eis to progress in the same direction in which it was started and is to be such that the limit control will
5 h1 u8 `+ h/ a" F3 v* \& A# yremain in the air flow for the longest possible time as blocking progresses. If temperatures cause
3 G/ ^" D1 m- b0 A7 |7 ?degradation of the tape, or if the use of tape would cause deformation of an outlet nozzle, a metal plate1 y8 A6 J ?: O1 s
or other material resistant to combustion may be used to block the outlet opening. If the final 100 percent8 R/ s9 i6 S3 j9 x b
blockage test does not result in interruption of all heater and motor circuits by a limit control, the test is to
4 ^" s- _' U Q- I+ N9 a* i& kbe continued, at 100 percent blockage, for 7-1/2 hours, at which time ultimate results are considered to$ u" Z2 f4 g. q/ ~$ ]0 z! {6 z
be achieved.
9 u9 A% R2 `; ?$ W) I, O是不是TCO动作了不停止了,还是做到最终结果或者是FUSE开路? |
|