|
引用第1楼hellostudy于2009-05-11 17:49发表的 :
% F9 j1 g# n5 @1 F& R3 w" x0.1uF 以下不需要做这个测试的吧? 3 _+ {! {# U2 b o% Q8 s E: B5 l K
The test shall be performed ten times.( t# l f3 p, q& l! z
The test between lines and ENCLOSURE shall not be performed if interference suppression2 q1 ?1 S$ t# H% ~9 r! F: B2 C
capacitors are used with a capacitance between each line and earth of less than 3 000 pF for- V* r9 c! d6 _# ^& X r
RATED voltages up to and including 250 V or 5 000 pF for RATED voltages up to and including
# z) L; g) ]: N% O# s3 {) p125 V. The test between lines shall not be performed if interference suppression capacitors less than or equal to 0,1 uF are connected between them. |
|