|
1.2.2.1 MAXIMUM OUTPUT VOLATGE,CURRENT, AND VOLT-AMPERE MEASUREMENT TEST8 ]7 ^+ z8 v+ R1 P# Y
1.6.2 INPUT TEST:SINGLE-PHASE
4 q. r2 f1 x9 g( C& E( Q, Y2.2.2,2.2.3,2.2.4 SELV RELIABLITY TEST1 o9 C F$ @6 Q
2.4.1,2.4.2 LIMITED CURRENT CIRCUIT MEASUREMENTS) q& _7 `7 f4 X8 G: u
2.5 LIMITED POWER SOURCE MEASUREMENT
5 X% ]* F% y/ d% h! z& U6 t8 Z2.9.2 HUMIDITY TEST. {& S# G Y8 \/ ]# u. I
2.10.2 DETERMINATION OF WORKING VOLTAGE
7 z$ ]; j( F1 s" V2.10.2.6,2.10.5.13 TRANSFOEMER AND WIRE INSULATION ELECTRIC STRENGTH TEST
3 B6 _" u! U2 e: t G" R% j( }) Y$ E3.2.6,4.2.1,4.2.7 STRAIN RELIEF TEST
. Q! x b7 h; P6 a2 Z4.2.4 STEADY FORCE TEST
+ j) } O1 f1 N ~. d4.2.6 DROP TEST: M3 c4 W# w; t7 `8 h: a6 f! ]
4.2.7 SRESS RELIEF TEST
- T; ]3 ~# A5 B) _6 f4.5.1 HEATING TEST
# I8 c' D( i: y6 [/ E3 E4.5.5 BALL PRESSURE TEST) L3 E- Q# b* }. a
5.1 TOUCH CURRENT
2 f% E2 M! ?, w% x; l5.2.2 ELECTRIC STRENGTH TEST9 W8 w5 c8 k5 g7 W, k
5.3.1, 5.3.4, 5.3.7 COMPONENT FAILURE TEST + a& R4 C8 Q( _% e
5.3.3, 5.3.7b, ANNEX C.1 - TRANSFORMER ABNORMAL OPERATION TEST
; E" k7 A- S2 C/ E5.3.7 POWER SUPPLY OUTPUT SHORT-CIRCUIT/OVERLOAD TEST 9 F" u: X" T) F% q! s) n
我这是参考UL60950-1 ,有不全或者错误的地方请指正。 |
|