安规网

 找回密码
 注册安规
安规论坛 | 仪器设备 | 求职招聘 | 国家标准 公告 | 教程 | 家电 | 灯具 | 环保 | ITAV 签到 充值 在线 打卡 设备 好友| 帖子| 空间| 日志| 相册
IP淋雨机 | 证书查询 | 规范下载 | 资质查询 招聘 | 考试 | 线缆 | 玩具 | 标准 | 综 合 红包 邮箱 打卡 工资 禁言 分享| 记录| 道具| 勋章| 任务
水平垂直燃烧机 | 针焰 | 灼热丝 | 漏电起痕
IP防水防尘设备|拉力机|恒温恒湿|标准试验指
灯头量规|插头量规|静风烤箱|电池设备|球压
万年历 | 距元旦节还有
自2007年5月10日,安规网已运行
IP淋雨设备| 恒温恒湿箱| 拉力机| 医疗检测设备沙特Saber 埃及COI 中东GCC|CoC直接发证机构水平垂直燃烧机|灼热丝|针焰试验机|漏电起痕试验机
灯头量规|试验指|插头插座量规|灯具检测设备耐划痕试验机|可程式恒温恒湿试验箱 | 耦合器设备广东安规-原厂生产-满足标准-审核无忧
查看: 493|回复: 3

[美洲灯具] UL1573 41.2 test for limited - voltage / current circuit transformers 怎么测试

[复制链接]
发表于 2016-11-16 09:32 | 显示全部楼层 |阅读模式
广东安规检测
有限公司提供:
UL1573 41.2 test for limited - voltage / current circuit transformers 怎么测试0 o3 \3 t% W  W, p" h0 t7 ?9 Y
发表于 2016-11-16 11:43 | 显示全部楼层
你把标准截图上来啊!

点评

41 Test for Limited-Voltage/Current Circuit Transformers 41.1 A transformer intended to power a limited-voltage/current circuit shall be tested as described in 41.2. 41.2 The maximum volt-ampere out  详情 回复 发表于 2016-11-16 11:54
回复 支持 反对

使用道具 举报

发表于 2016-11-16 11:54 | 显示全部楼层
head0819 发表于 2016-11-16 11:43 2 }' Y5 A# b' T9 I; [: Y
你把标准截图上来啊!
/ s" `$ A$ G2 ^
41 Test for Limited-Voltage/Current Circuit Transformers1 {2 n$ P) |) H$ C4 n
41.1 A transformer intended to power a limited-voltage/current circuit shall be tested as described in 41.2.
# [: ]- ], j8 b41.2 The maximum volt-ampere output capacity of the secondary winding is to be determined as follows:7 j3 T: b4 t+ E# Z( Q
At room temperature, the primary winding of the transformer is to be connected as intended in the, j% z& R7 |* K9 j1 K
equipment and the secondary winding in question is to be connected to a variable resistance load. When) ^, q) Z3 X& |$ B! @) v, k
a fixed-series impedance or regulator circuit is relied upon to limit the output, that impedance or regulator
7 a2 @' u2 h+ S, [; Z; j9 q  lcircuit is to be included in the circuit during the test. A multiple-winding transformer is to have one9 S& p1 e' g3 q
secondary winding tested with all other secondary windings open-circuited, and is to be allowed to cool to9 f5 G8 Q% l( o% v% k3 ^/ p% t: U
room temperature again before another winding is tested. A primary winding is to be connected to a
7 X3 N; X$ K* e: q! ~source of rated voltage. The load on the secondary is to be varied in 10 increments from open-circuit to
# ]" w" G; ~3 w7 _' S$ P4 R. Jshort-circuit condition in 2-1/2 minutes. For each step or increment in the resistance, the product of the
: }$ Q5 ]5 L2 r* _output voltage and current is to be recorded, plotted, and run as a smooth curve. The peak value obtained; m5 f" X. R* I. ~" y) `6 C: b
from the curve shall not exceed the volt-ampere value specified in Table 27.1. When two or more) z. ^, K: Q* U. {' A
secondary windings supply interconnected circuits, the sum of the outputs of the windings in question shall- z; e# Y* ^. r* b/ r
not exceed the values specified in Table 27.1.
9 ~0 I5 `8 [* J0 O6 s" S4 F& t6 Z) E! R0 D' F
做舞台灯的大部分都在广州及花都,2010-2012年间有多少家的舞台灯具被我拆的七零八落呢?
回复 支持 反对

使用道具 举报

发表于 2016-11-16 13:02 | 显示全部楼层
受教了
回复 支持 反对

使用道具 举报

您需要登录后才可以回帖 登录 | 注册安规

本版积分规则

关闭

安规网为您推荐上一条 /1 下一条

QQ|关于安规|小黑屋|安规QQ群|Archiver|手机版|安规网 ( 粤ICP13023453-10 )

GMT+8, 2024-11-24 03:15 , Processed in 0.062127 second(s), 26 queries .

Powered by Discuz! X3.4

© 2001-2023 Discuz! Team.

快速回复 返回顶部 返回列表