引用第0楼sam_qi于2010-09-28 11:56发表的 向ul1310标准高手请教 :
标准提到有bobbin-wound transformer 这种变压器要做15天的测试。
13.2.4 A flanged, bobbin-wound transformer shall be subjected to the output loading test described in
39.2. The test shall be continued for 15 days if the transformer has
.......